Generation on site and carrying load in weeks — the same speed as a rental diesel deployment, on a fuel that does not box you in.
We mobilize modular reciprocating gensets at diesel speed and run them from hour one on renewable diesel or an HVO blend drawn from our own fuel supply. Same schedule, materially lower emissions intensity, and a contract that already contains the step to gas.
| Parameter | Specification |
|---|---|
| Time to first power | Typically 30–90 days, site dependent |
| Equipment | Modular reciprocating gensets, containerised |
| Phase 1 fuel | Renewable diesel / HVO blend |
| Scope | Generation, distribution, controls, fuel, O&M |
| Contract | Single PPA with defined step points |
Speed to power for training clusters, inference halls and colocation campuses — without a diesel-only bridge.
Read moreSite power for multi-year builds where the permanent supply arrives after the programme does.
Read moreFrac fleets, drilling and production facilities electrified on bridge fuel rather than field diesel.
Read moreSend a load profile, a site location and a required date. We come back with the rung you should start on, the delivered cost at each phase and a schedule we will stand behind.