Behind-the-Meter Power

Dedicated generation on your side of the meter. No interconnection application, no queue position, no network upgrade cost allocation.

The Problem

What makes this hard.

  • Interconnection studies and utility upgrades routinely add years to a project schedule.
  • Even where capacity exists, upgrade cost allocation can land entirely on the first mover.
  • Demand charges and tariff structures penalise exactly the load shapes modern facilities have.

Our Approach

We finance, build, own and operate the plant on your property and sell you the output. We take the equipment risk, the fuel risk and the operating risk. You take power, metered at your load, at a contracted rate.

What You Get

Delivered as a service, owned and operated by us.

  • Sited on your land under lease or easement; we retain the generation assets
  • All-in delivered rate including fuel, or unbundled if you prefer
  • Grid-parallel or fully islanded, switchable as your interconnection matures
  • No capital outlay, no EPC contract to manage, no operating headcount
  • Availability commitments written into the agreement
ParameterSpecification
InterconnectionNot required
OwnershipCrossbridge Power owns and operates
StructurePPA, tolling agreement or capacity lease
FuelBridge fuel at rung 01, gas at rung 03+
Customer capitalNone
Where It Applies

Sectors that use this most.

Related Capabilities

Put a number on it.

Send a load profile, a site location and a required date. We come back with the rung you should start on, the delivered cost at each phase and a schedule we will stand behind.